Horizontal Drilling - Technology and Equipment
PIPING WITHOUT EXCAVATION WORKS THROUGH MACHINES FOR HORIZONTAL DRILLING
SPECIFICS AND FUNCTIONALITY
The company ELS JSC has three machines at its disposal that are used for horizontal piping according to a technology without excavation works and one of these machines is the most modern one in Bulgaria – GRUNDODRILL 15X.
The spectrum of application covers all construction works related to water, gas and central heating supply, placing pressure-resistant pipes for waste waters, as well as pipes for protection of power, optical and telecommunication cables.
Technical application - Grundodrill 15x
The machine is able to place pipes with diameter of up to 400 mm – polythene and up to 500 mm – steel, depending on the length of the drill. The maximum length of the drills is 200 meters. It has high productivity with smaller diameter pipes and is far better than the excavation technology. The machine has a controllable drilling lever, which is directed through a localization system.
Grundopit
Advantages
- Suitable for drilling in hardly accessible terrains;
- If you need a fast, precise, clean and profitable solution;
- If you need to avoid work in the open during construction;
- When you make additional building deviations with a diameter of 125 mm;
- Placing pipelines under all types of park facilities, hardly accessible places, and buildings.
Technical application
GRUNDOPIT is a drilling machine that is operated by hydraulics and can be used for connections for optical cables, water and gas supply and sewage. According to the type of the soils, pipes with diameter of up to 125 mm can be drawn out with a length of the drill of 40 meters.
Due to its small width, length and height, this facility can be used in small size excavations. The facility has controllable drilling lever, which is directed through a localization system.
MOLE – for diameters of up to 32 mm.
Technology:
The piping is carried out through a machine for horizontal drilling and in this way the damages to the environment are insignificant. The pipes are placed at a depth according to the customer’s request or according to the design. The PROCESS itself passes through the following stages:
- Design/Preliminary study
- Selection of the machine and the instrument for drilling
- Pilot drilling with localization
- Expanding /once or several times to the desired diameter of the drilling/
- Drawing out the pipe
During the pilot drilling and the drawing out of the pipe a washing liquid is used /bentonite/, which is absolutely environmentally friendly. We work with the products of the company BENTONIL, which is a leader in the world market.
Advantages
This method of placing is applied with high success at places where excavation is impossible – such as crossroad passes, railway lines, buildings, rivers and others.
The company has modern technical equipment;
It works with highly qualified and experienced staff;
We offer short deadlines for completing the projects with minimum damages on the environment.
Industrial Projects realized by ELS Drilling Department:Plovdiv City - built linear parts and passage for gas-main in central and industrial city, bellow national roads, bellow collectors, tunnels, railway, bellow and around Buildings, bellow crossing and etc.
Septemvri Town - built passage below railway, rivers and national roadsStara Zagora City - built passage bellow main national roadsGeneral Toshevo Town - built passages bellow national roadsBalchik Town - built passages bellow main national roads - permanent way for gas-main, water-main and optical cablingKavarna Town - built passages bellow main national roads and crossing in the townBeloslav Town - built passages bellow main national roads and railwayProvadia Town - built gas-main permanent way and passages bellow main national roads, bellow buildings and railwayRousse Shipyard - built permanent way to gas-mainVarna Airport - passage and part of permanent wayVarna City - passages bellow main national roads, collectors and crossingsHighway Varna - Sofia - passages bellow highway - providing sewerageKurtovo Konare Village - passages bellow main national roadsAlbena Resort Complex - passages bellow main national roads - water-main and providing sewerageTargovishte City - built parts of permanent way for providing of drains"V i K" Pls. Dobrich City - passages below main national roadsTopola and Bojurets Villages - passages below main national roadsKalitinovo Municipality - main gas-main